What are the climatic and geographic design criteria for Teton County?

Wind Speed - 115 mph, Seismic Design - D1/D2, Weathering - severe, frost line depth - 34", termite - slight, winter design temp - -30, ice shield underlayment required - yes, air freezing index - yes, mean annual temp - 38.   For floodplain, wildland urban interface and ground snow load you can search the specific address on the GIS map and use the layers to get exact information.

Show All Answers

1. What are the climatic and geographic design criteria for Teton County?
2. Does a change in building code require me to retrofit my building?
3. Do I need a building permit to build a wood deck?
4. Is a building permit needed for storage shed?
5. Who is responsible for scheduling inspections?
6. If I call in an inspection when will the inspector show up?
7. Can I schedule inspections online?
8. Do I have to be present at an inspection I schedule?
9. Do I need a building permit to pour concrete flat work (driveways, walkways, etc.)?
10. When is a certificate of occupancy (CO)/certificate of completion required?
11. It`s the middle of winter, the house is done but I can`t finish the site work (grading or landscaping). Can I get a Certificate of Occupancy (CO) now and get my final site work inspection(s) later?